Custom Safe Work Method Statements (SWMS) For Your Work - Acceptance Guaranteed

Custom SWMS - electrical, plumbing, carpenter, builder, gasfitter, painter, plasterer, cleaner, tiler, bricklayer, concreter, plant operator, demolition, excavation

Custom SWMS - electrical, plumbing, carpenter, builder, gasfitter, painter, plasterer, cleaner, tiler, bricklayer, concreter, plant operator, demolition, excavation

Safe Work Method Statements (SWMS) are a legal requirement for any high-risk construction work in Australia. Having an up-to-date SWMS is vital to ensure the task is done correctly and above all, safely.

ISOsafe prepare custom SWMS, Job Safety Analysis (JSA) and Risk Assessments for all types of work and equipment.

Call Us - 1300 789 132
Make An Email Enquiry

Each custom SWMS is prepared specifically for your needs, we insert all your details, including logos into the SWMS so its ready to use right away.

Our documents are prepared by highly qualified health and safety professionals, each with many years of industry experience.

We prepare each SWMS in simple, everyday language so that everyone can understand and follow it. 

Our SWMS comply with legislation (WHS Act 2011, WHS Regulations 2017) in all States/Territories, Australia-wide. 

We prepare SWMS for all industries and just about any activity – contact us today 1300 789 132

In addition to SWMS, we can build complete Safety Management Systems (SMS):

•             Site specific safety management plans (SSSMP)

•             OHS Policies

•             Tools such as:

o      risk assessment template

o      pre-start checklists

o      Safe Operating Procedures (SOP)

o      electrical test & tag and hazardous chemicals registers

o      site specific induction forms

o      incident forms

o      workplace inspections forms

We prepare tailored SWMS for all Industries and activities:

•             Agriculture

•             Air Conditioning

•             Asbestos

•             Auto Industry

•             Bricklaying

•             Carpentry

•             Civil Road Works

•             Cleaning

•             Communications

•             Concreting

•             Construction

•             Earthmoving

•             Electrical

•             Engineering

•             Flooring

•             Landscaping

•             Glazier

•             Handyman

•             High Risk Construction

•             Hospitality

•             Joinery

•             Make Safe

•             Manual Handling

•             Manufacturing

•             Mobile Plant

•             Painting

•             Pest Control

•             Plastering

•             Plumbing

•             Office/Retail

•             Refrigeration

•             Roofing

•             Security

•             Shop Fitting

•             Silica Dust Exposure

•             Solar

•             Swimming Pool

•             Tiling

•             Transport & Logistics

•             Tree Lopping/Felling

•             Warehousing

•             Welding

•             Working at Heights

Our SWMS are up-to-date with current requirements and cover all States/Territories.

Guaranteed acceptance by your client.

Call ISOsafe Today 1300 789 132

Call Us - 1300 789 132
Make An Email Enquiry